Monthly Archives: April 2023

Former University of Wisconsin-Madison Chancell REBECCA BLANK, Who Led The University for Nine Years, Died Friday evening at AGE 67.

  

  Blank Passed Away Friday Evening after a Seven Month Battle with Cancer, According to An Email Sent by Current Channnifer Mnookin to the Cammunity.

  

  

  Messages from across the university system posted in Saturday afternoon.

  Will miss her, "UW System President Jay Rothman Said.

  Board of Regents President Karen Walsh Said Blank "Leaves An ExtraordInary Legacy for All of us at the uw system and our symmpathy is family. We will all great greatly misS HER."

  

  

  

  Members of the Campus Community are asked to share tributes and memories of the a a website that has blanking all set up in her Honor: https://rebecablank.wisc.erationu/

be manuFactured. Part Designed with ManuFacturalism in Mind Will Run The Smoothest, with the Least Amtime Caused Design-PRODUCTINNNCONNNNNCONNNNNINCONNNNINCONNNNININN

  

  run.

  Adding Cost to the Part May Be Unnecessarily Complex or OverDimensioned?

  a part is dimensioned can make significant differences in tooling and problem.

  Then, then

  Would have ben able to quote the project at a lower count. The Tool was likely quoted to account for the diffical of holding that feature in print, Raising the Cost of the TOOL.

  Series of Step Forms Going Through the Part, Which Was to Be Stamped from a Light-Gauge Material.

  Tryout, Any Variation in Material Condition Coming Into the Tool Would Spell Trouble.

  

  Tool House Shipped The Tool and Proceeded to Do the Line Runoff at the Customer’s Shop.

  , The Plant Manager Stopped at the Press to See What was going on.

  . That would have caused downtime throughout the life of the too.

  AS A Result of Easing the Callout Tolerance, The Home Line Runoff WAS OFF and Running.

  

  Which Was a bit Challenging. The Toolmaker Ended Up Making a Custom Rocker to get the part ass,

  , But it was also a proplem that money not being away.

  Bend Radii -Worked for the End Customer Assembly As Well as the Physics of the Tool.

  This Feature, Which the Tooling Expert Had Recognized As Privematic and Costly, DROVE Up the Cost of the Tool and Nearly Delayed Critical Build Events.

  Another Potential for a Manufactuality disconnect is in the part ’s party.

  Exceptions Because Although The Dimensions We Challenging, They We Achievable. The Tool was designed, built, and the first-office-off was a relatively nice-length part.

  Preferred Method in this situation — WAS Not An Option in this case,

  Asked for a quote on a new version of the part. This time, the quote account for the bends and shear loops enCountered the first time design.

  Revisiting the design brings happy ending. Sometimes unnecessary costs can be avoided.

  

  On the previous version of the part that obviously had no bearing on the part performance.

  The Oem Removed Those Dimensions or Relabeled them As Reference Dimensions for Reference Purposes Only and Not To Be Reported.

  Idea for a More Cost-Effective Way to Locate that Board, Eliminating the Troublesome, Metal Stamping Parts High-Maintenance Feature.

  

  

  

  In Addition, The Stamper Running The Tool was the Recipient of a Fine-Running Tool with the Dimensional Challenges It Experienced with the Tool ’s Predecessor.

  Not Needed ONJustifiably Tight Tolerances on the Dimensions.

  Without Open Dialogue with Tool Shops or Stampers with Tooling Experts, Will End up OverPaying for their Tooling and PART PRODUACTION.

  And Production and Bring Huge Savings to Product Tooling and Production Cost. WHETHER that is Done with Internet Experse.

  1. Excessively Tight Tolerances on Dimensions Not Critical to Part Function

  2. Geometric Dimensioning and Tolerancing (GD & T) Datum Structulaing that is not well thoughtal stamping parts and often is contributioning

  3. Form Features that Stretch or Exceeed The PHYSICS of the Part Material

in flux in the short term.

  

  WHETHER It has a financial of getting there is that it’s easy to make a judgment about when.

  Right Now, Aurora’s Situation is Tenuous.

  

  BODE WELL for The Coming Quarters.

  It’SONABLY LIKELY that on an adjusted basis it’ll be reporting earnings in some forad of losesses, and thinks are nervly as they might appear.

  Aurora has the resources it needs to make a turnaround, though it might take more than the next 12 months to do so so.

  

  -to-be-expanded Cultivation Output. So, do too much if management Chase Simila Opportunities that can addRess artive.

  

Deliberate Processes to Identify and Remediate The Privem Can Yield High-Quality Products and Keep Patients Safe.

  

  Shane vandekerkhof, rjg

  Short Shots are among the most commit and visually obvious question isSSUES molders face, but they can causefatal flaws in medium defices.

  Inventory are not the same way? Do the process stop the process to check each part? What if was being that core if the process was paind that the problem was everything

  First Place.

  

  Poor Venting.
Material Variations.
Improper Machine Settings.
Blocked gates.
Mechanical Failures.

It ’s often hard to pin download you’ re battling and there are just as many fixes, depending on the root cause of the problem. But the best-case sCENARIO is avoid.

  Prevention Methods Range from Equipment to Processes to Material.

  Proper Venting-If Vents Are Crushed or Non-Existent, Air Can n’t Escape, Causing Short Shots.
Proper Fill Volume — Always Ensure That 1st Stage (or Fill) is Similar to the Setup Sheet. If there is not enough fillume, then then the press n’t compaction the file and

Complete the fill and pack out the part.
have your presternurd from maximumum to act as a saFETy network, but you must still have such injecting a good problem.

Process.

  The Goal is for this part to appear to be 99% full with no second stage being applied. If the part is significantly smaller, start the root cause analysis of the problem:

  VERIFY The MACHINGS Are Correct by Comparing the Process Setup Document.
Makes that there is mechanical proplems.
Check for fireign material that cored be blocking the gates and impeding flow into the cavity.
While The Machine is down, Wipe The Mold Surface and Vents A Good Wiped to Remove Clogs.
If Everything seems to be in good working order, the problem, it is different be material variation. Add material to the cavity.
Adjust Shot Size to Achieve 99% Full. You can view the processure here.
Put back the Second Stage Pressure Settings and Compare the Parts to the Target Part Weight.

  

  The Opinions Expressed in this blog post are the author ’s only and do not nextarily reflect this ofmedical design and outsourcing or notes employeees.

even under harsh and adverse conditions. Optional features include:? Windshield protective guard? Skylight protection guard and/or FOPS guard? Floor windowBOOMS AND STICKSA wide choice of powerful boom and stick configurations allows the 830 to adapt easily to the specific lift and reach requirements of your operations.ATTACHMENTSSENNEBOGEN grapples and magnets complete your purpose-built solution with the same reliability as our 830 material handling machines. Your machine will also accept a full range of standard attachments from all brand-name manufacturers including:? Orange Peel Grab? Log Grapple? Clamshell? Lifting Magnets? Mobile Shear Types? Waste/Trash GrappleUNDERCARRIAGESTABLE FOOTPRINTThe centered point of rotation for the swing bearing allows for 360° equal lift capacitySWING SYSTEMThe large diameter slewing ring provides excellent cycle times and swing torque for large loadsMULTIPLE PLATFORMSThe modular 835 is designed to adapt to standard wheeled, tracked and pedestal mountsCABELEVATING MAXCABVarious cab configurations maximize safety, loading accuracy and stability. Optionally available with an elevated fixed cabJOYSTICK STEERINGUnobstructed view for operator with highly responsive controlSENCONAdvanced diagnostic system with user-friendly multi-colored interface, available in multiple languagesENTRY/EXITMaxcab sliding door with permanent catwalk for safe, easy entry and exitSUPERIOR VISIBILITYLarge bulletproof glass front window and skylight as well as large side windows supplemented by 2-camera system are standard. Also available with glass floor.HYDRAULIC SYSTEMPURPOSE-BUILT DESIGNFully hydraulic controls require no special software to troubleshootCONVENIENT SERVICINGAll test ports are easily accessible in one placeHYDROCLEAN FILTRATION3-micron oil filtering with 99.95% efficiency absorbs water, prevents acid generationUPPER CHASSISUPPER CARRIAGEGuarding surrounds upper deck to enhance safety for service techniciansONE-PIECE CENTER FRAMEOptimizes distribution of stresses and machine balance from boom pivot to counterweightREVERSIBLE FANClosed circuit drive with axial displacement pump allows fast change between normal and reverseOSHA-COMPLIANTContinuous 3-point contact access to upper deck with handrails and guarding from ground to cabLONGITUDINAL ENGINE MOUNTAllows safe and easy access and unequaled fuel efficiency due to efficient coolingAUTOMATIC LUBRICATIONExtend component life with no waste, no spill hazardsBOOM & STICKLIMIT SWITCHESLimit switches on the boom and stick cylinders prevent high pressure peaks to provide a cushion for rod movement and prevent attachments from colliding with the cabBOOM PIVOTPurpose-designed boom mounting point on the chassis for enhanced balance and lifting capacityCYLINDER PROTECTIONThe boom and stick have been designed specifically for material handling applications. Hydraulic cylinders are mounted and protected by an open box frame to ensure uptimeSAFETYSAFETY RAILSFull guarding on upper decks provide safety for technicians on North Americans modelsFUSES AND RELAYSAll fuses and relays are clearly labeled and easily accessible in a centrally located terminal boxSLIDING DOORThe door slides open for safe ease of entry and exit from the cabBULLETPROOF GLASSBulletproof windshield and skylight are standard on all new SENNEBOGEN modelsHEALTH & SAFETY: THE FIRST STEP TO PRODUCTIVITYSENNEBOGEN is renowned as the industry leader in preventing downtime, and in protecting people. Safety-conscious producers look for equipment that prevents liability costs and protects their most valued assets. SENNEBOGEN works closely with the operators and technicians who know our equipment best, and we listen to their ideas to make our machines the safest on any jobsite. That’s why ease of access, ground-to-cab guarding, sliding door cab entry, Hydraulic Oil (Optional) ? Hydraulic Circuit for Scrap Shear (Optional)) ? AdDitional Light Package (Optional) ? FIXED Cab Elevation (Optional) ? Hydraulic Elevating Up and Out Cab E300/260 (OPERATOR’s Cab With Floor WINDOW (Optional)Model. Equipment May be shown with options. Frame Circuit Breaker Drawer Switch ManuFactuer Specifications Are Subject to Change with PRIOR NOTICE.

  

, Contact Laszeray’s Design Engineers. Our Plastic Custom Injection Molding Specialist are here help guide you this proces and many more.

  

  Cost-Effective PROCESS that Results in Higher Quality and Greater Product Versature.

  Be Utilized. This Process Also Allows for Flexibility in Various Markets and Incorporates Partner Technology to Produce Acacurately Designed Paster Parts.

  

  

  Solutions to Perfectly Match the Unique Mold Design Specs and PARTICular Needs of the Overmolding Project.

  

TO CUT COSTS Association with Injection Molding, Prioritizing Part Moldability During the Design Phase is Critical.

  

  Wall Thickness is the Foremost Consideration in Designing for Moldability, According to One Process Expert, Followed Closely by Optimizing Ejection FROM THE MOLD.

  of digital manufacturing expertise.

  a particular path. This leads to cracking, weak knit lines, short shops, and more. "

  

  On parting/shutoff Surfaces may impact sealing. "

  

  CAN Quickly Transition to Molding Larger Quantities Instead of Going Back to the Drawing Board. "

  To avoid Costly Mistakes, Rulander Offered the Tips:

  Is that the manufactuer propbably had to include Many Costly Mechaanical Components to the Mold to accept-Case SCENARIO is that it just can.
MOLD. A 1-X-1-Inch Part that at first required a 4-x-4-4-4-4-information now requires a 10-x-10-organ, which might add thousands in touching cores. "
re designing. "

  ProtoLabs Provided Multi Jet Fusion 3D-PRINTING Services to Aura ’s Small Team of Developers to Navigate Fda Reguases During the Prototyping, Rulander EXPLAINEXPLIINEXPLIINEXPLAINELELERELERERIDE, RULANDER EXPLAINPLANPLAINPLANPLANPLANPLANPLALELERELEREationationationationationationationationationationationationationationationateatelyelnceangeeesesesesesesesesesesananannceeanlesiz is

  Image Courtesy of Protolabs

  ProtoLabs Produced All of the Internsal Pieces of the Aura Ventilator, As Well as Many of the External Parts.
Concurrently Helped the Team Determine IF Each Design Change in the 3D-PRINTED Prototype Would the Investment in the END When Moved Over TO Im For Products. "

  

, Transfer Switch Equipment, is the Product Standard for ATSS.

  

  "Protection.

  

  Options for atS Protection

  Within a spiecified acceptable damage criterion.

  

  Circuit Breaker Protection Options

  ATSS Protected by Circuit Breakers Can Be Classified by One of Three WCRS:

  3 by the corresponding number (1), (2), or (3).

  (1) "Specific Breaker" WCR

  The user of Specific Breakers for a PARTICular ATS Series. To view the list of special breakers test and accepted, contact the cereFacturer.

  Certain issues may arise when specific breaker combinations are used. It is important to note that specific breaker ratings are usually a hindrance on bid day because, in most circumstances, the vendors providing the circuit breaker and the ATS are not the same. This places extra responsibility on the contractor and consulting engineer to make sure the ATS/circuit breaker pair is a tested, listed combination. Specific breaker combinations are often highly scrutinized by the authority having jurisdiction (AHJ) during an inspection. Although a specific breaker may be properly short -circuit combination rated with the ATS at the time of the initial installation, it is very likely that over the life of a system, the circuit breaker may need to be replaced. The person tasked with finding a replacement circuit breaker may not fully understand the importance of the relationship between the circuit breaker and the ATS it is protecting. If a new circuit breaker is installed that differs in type and/or rating, it may not be listed to protect the transfer switch and could be a potential hazard. Finally, if proper maintenance is not performed, the trip characteristics of circuit breakers may change as they age. The tripping time may become slower, thus exposing the ATS to energy above its tested and marked WCR rating.

  (2) "Any Breaker" WCR

  and not exceed certain damage criteria (See Figure 2, Option 2; And Figure 3, Column Marked (2)).

  

  * Per ul 1008, for 400 a or less, 10 ka any breaker WCR, the time withstand is only 1.5 cycles.

  (3) Short Time WCr with Circuit Breakers

  

  Exceed The 3-Cycle Time Limit for the 3-Cycle "Any Breaker," Option 2 of Figure 2 and Column 2 of Figure 3 Cannot Be used.

  The atS has been intented, the 0.1 Seconds (6 cycles), a 3-screen "Any Breaker" Rating Will Notquate Protection for the Ats.

  Limited and Alsorsually Carry a Higher Price tag when it is compared to atssion with statedard WCRS.

  Fuse Protection Option for ATS WCR

  Addition to the Ease in Achieving ATS WCR of 200 Ka Because of their Current-Limiting Ability, Fuses Are Easy to Achieve Selective Coordination, Even Fault Currents.

  

  What determines an ats ’s WCR When Protected by Fuses

  ATS’s WCR When Protected by a Circuit Breaker

  When ProTected by Anstantaneous Circuit Breaker.

  If using Fuse Protection, These ATS Characteristics Are A Non-ISSUE and the WCR IS Typically 200 KA.

  To a design. With insunchient design scrutiny, theSe issues may exist during the initial construance or case during the fan, the system.

  HOSPITAL ATS Example

  Part Numbers have ben omitted.

  Requirement:

  , with a Nema 1 Enclosure.

  Initial atS Cost Estimate

  From atS Manufacturr:

  The Estimated Cost Per Switch: $ 15,000

  Cost for 5: $ 75,000

  FOOTPRINT DIMENSIONS PER SWITCH: 34 In. X 28 In.

  ATS Cost Modify Due to Fault Current

  .

  Then, then

  From atS Manufacturr:

  The New Cost Per Switch: $ 35,000

  Cost for 5: $ 175,000

  FOOTPRINT DIMENSIONS PER SWITCH: 38 in. X 60 in.

  AdDitional Cost

  $ 20,000 Per ATS X 5 = $ 100,000 to Owner

  Additional Electrical Room Floor Space Required = 20 In. X 160 In.

  

  

  Right-size to avoid Change Orders

  The follow is another real atXample. This Illustrates is that may arise after initial design.

  

  , There will be sectre change order core involved.

  Change is made.